Boiler Installation

BOILER ROOM SETUP

Equipment Layout, Process Flow & Safety Compliance Reference

RSC / BNBC 2020 Aligned

1. Overview

This document describes a standard steam-boiler room setup for a fire-tube, horizontal industrial boiler installation, covering the fuel/combustion side, the steam generation and distribution side, and the feed-water treatment train. It is intended as a reference for equipment layout planning, commissioning checks, and compliance review against RSC (Remediation Coordination Cell) guidance and BNBC 2020.

 

2. Equipment Schedule

The table below lists each station shown in the reference boiler room layout, its function, and the key design parameter to confirm during equipment selection or vendor submittal review.

# Equipment / Station Function Key Parameter / Spec
1 Electric Control Panel Central control & safety interlocks for burner, feed pump, flame failure, low-water and high-pressure trips As per burner/boiler OEM control schematic
2 Fuel Supply System Delivers fuel (gas / diesel / HFO) to burner via filter, pressure regulator & shut-off solenoid Per burner capacity & fuel type
3 Burner Ignites fuel-air mixture to fire the furnace tube Sized to boiler rated capacity (kg/hr steam)
4 Boiler (Fire-tube, horizontal) Generates steam via flue-gas heat transfer through fire tubes Rated pressure, capacity (TPH), fitted with safety valve, pressure gauge, water level gauge
5 Economizer Recovers flue-gas waste heat to preheat feed water Typically improves efficiency 5–10%
6 Steam Header Collects & distributes steam to plant steam supply lines Design pressure ≥ boiler MAWP
7 Water Softener Removes hardness (Ca/Mg) via ion-exchange resin Output hardness < 1 ppm as CaCO3 (typical)
8 Water Tank Storage / buffer for softened water Sized for min. 20–30 min. feed reserve
9 Deoxygenated Water Pump Transfers softened water to/through deaerator Per feed water flow rate
10 Deaerator Removes dissolved O2 and CO2 (mechanical + thermal, flash steam) Target dissolved O2 < 0.007 ppm (EN standard)
11 Chemical Dosing Barrel Injects oxygen scavenger, alkalinity builder & sludge conditioner Dosing rate per water analysis / boiler TDS control
12 Feed Pump (Duty/Standby) Delivers treated, deaerated water into boiler against boiler pressure Discharge head ≥ 1.25 × boiler MAWP

 

 

3. Process Flow

3.1 Feed Water & Steam Side

Raw Water  →  Water Softener  →  Water Tank  →  Deoxygenated Water Pump  →  Deaerator (+ Chemical Dosing)  →  Feed Pump  →  Boiler  →  Economizer (flue-gas heat recovery)  →  Steam Header  →  Steam Supply (plant)

3.2 Fuel & Combustion Side

Fuel Supply System  →  Burner  →  Boiler Furnace  →  Flue Gas  →  Economizer  →  Chimney / Stack

3.3 Control

The Electric Control Panel supervises burner firing sequence, feed pump duty/standby switching, and monitors safety interlocks (flame failure, low water level, high steam pressure) across both sides of the process.

4. Feed Water Treatment Chain — Purpose of Each Stage

  • Water Softener: removes hardness-forming ions to prevent scale build-up on fire-tube surfaces, which reduces heat transfer and risks tube overheating/failure.
  • Water Tank: provides buffer storage and residence time ahead of deaeration.
  • Deaerator: removes dissolved oxygen and CO2 — the leading cause of pitting corrosion in boiler shells, tubes, and condensate/feed piping.
  • Chemical Dosing Barrel: maintains correct alkalinity, scavenges residual oxygen, and conditions sludge/TDS for controlled blowdown.
  • Feed Pump: delivers conditioned water into the pressurised boiler shell; run in duty/standby configuration for continuity.

5. Water Quality Parameters (EN Standard Reference)

Indicative feed-water and boiler-water limits for a low/medium-pressure fire-tube boiler (below 20 bar). Actual limits should be confirmed against the boiler OEM’s water quality specification and RSC/CKDL 2020 framework requirements.

Parameter Feed Water Limit Boiler Water Limit (typical, <20 bar)
pH @ 25°C 8.5 – 9.5 10.5 – 11.8
Total Hardness (as CaCO3) < 1 ppm —
Dissolved Oxygen < 0.007 ppm (7 ppb) —
TDS < 5 ppm < 3000 ppm (blowdown controlled)
Silica (as SiO2) < 0.02 ppm < 150 ppm
Iron (as Fe) < 0.05 ppm —
Alkalinity (P-alkalinity) — sufficient to buffer, per dosing program

 

 

6. Room Layout & Safety Clearances (RSC / BNBC 2020 Aligned)

Item Minimum Clearance / Requirement Reference
Boiler front (burner side) to wall Min. 2.0 m for burner removal & maintenance access BNBC 2020 / RSC Guidance
Boiler rear / sides to wall Min. 1.0 m all-round for inspection & tube cleaning BNBC 2020
Boiler top to ceiling/roof Min. 1.5 m (or per chimney/duct routing needs) RSC Guidance
Room ventilation Continuous fresh-air supply + power ventilation for combustion air & heat removal; min. 2 air changes/hr BNBC 2020, Fire Safety
Emergency exits Minimum 2 independent exits from boiler room, outward opening RSC / Fire Safety Rules
Fire-fighting provision CO2/DCP extinguishers + fire hydrant point at room entry; fire-rated door (min. 2 hr) BNBC 2020 Part 4
Safety valve discharge Vented to safe location outside room / above roof, away from walkways IBR / RSC Guidance
Electrical fittings Flame-proof / weatherproof fittings near fuel & burner zone BNBC 2020 Electrical Code

7. Commissioning & Inspection Checklist

  • Verify safety valve set pressure and test lift/reseat before first firing.
  • Confirm low-water cut-off and flame-failure interlocks trip correctly (simulated test).
  • Check economizer and feed line for leak-tightness under hydro test pressure.
  • Verify water softener regeneration cycle and confirm treated water hardness < 1 ppm.
  • Confirm deaerator vent steam flow and dissolved oxygen at outlet meets target.
  • Log chemical dosing rates against first-week boiler water TDS/alkalinity trend.
  • Confirm fire-fighting equipment, room ventilation, and emergency exits are in place before occupancy/use.
  • Record burner combustion efficiency test (O2/CO in flue gas) and file with commissioning report.

8. References

  • Bangladesh National Building Code (BNBC), 2020 — Fire Safety & Mechanical Services provisions.
  • RSC (Remediation Coordination Cell) Guidance — boiler installation & water quality compliance framework.
  • Bangladesh Labour Act — provisions relevant to pressure vessel/boiler operation and worker safety.
  • Boiler OEM technical manual and water treatment vendor specification sheets (project-specific).
We use cookies to improve your experience on our website. By browsing this website, you agree to our use of cookies.
CiyaShop
Hello User

Join Our Newsletter

Subscribe to the CiyaShop mailing list to receive updates on new arrivals, special offers and other discount information.
Product added!
The product is already in the wishlist!
Removed from Wishlist