{"id":100,"date":"2026-03-11T09:15:16","date_gmt":"2026-03-11T09:15:16","guid":{"rendered":"https:\/\/alphasonarbanglamep.com\/?page_id=100"},"modified":"2026-07-18T06:00:37","modified_gmt":"2026-07-18T06:00:37","slug":"boiler-installation","status":"publish","type":"page","link":"https:\/\/alphasonarbanglamep.com\/index.php\/boiler-installation\/","title":{"rendered":"Boiler Installation"},"content":{"rendered":"<p><strong>BOILER ROOM SETUP<\/strong><\/p>\n<p><strong>Equipment Layout, Process Flow &amp; Safety Compliance Reference<\/strong><\/p>\n<p><em>RSC \/ BNBC 2020 Aligned<\/em><\/p>\n<h1><strong>1. Overview<\/strong><\/h1>\n<p>This document describes a standard steam-boiler room setup for a fire-tube, horizontal industrial boiler installation, covering the fuel\/combustion side, the steam generation and distribution side, and the feed-water treatment train. It is intended as a reference for equipment layout planning, commissioning checks, and compliance review against RSC (Remediation Coordination Cell) guidance and BNBC 2020.<\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-447 aligncenter\" src=\"https:\/\/alphasonarbanglamep.com\/wp-content\/uploads\/2026\/07\/Boiler_Room_Setup_Diagram-300x176.png\" alt=\"\" width=\"300\" height=\"176\" srcset=\"https:\/\/alphasonarbanglamep.com\/wp-content\/uploads\/2026\/07\/Boiler_Room_Setup_Diagram-300x176.png 300w, https:\/\/alphasonarbanglamep.com\/wp-content\/uploads\/2026\/07\/Boiler_Room_Setup_Diagram-1024x600.png 1024w, https:\/\/alphasonarbanglamep.com\/wp-content\/uploads\/2026\/07\/Boiler_Room_Setup_Diagram-768x450.png 768w, https:\/\/alphasonarbanglamep.com\/wp-content\/uploads\/2026\/07\/Boiler_Room_Setup_Diagram-600x352.png 600w, https:\/\/alphasonarbanglamep.com\/wp-content\/uploads\/2026\/07\/Boiler_Room_Setup_Diagram.png 1401w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<h1><strong>2. Equipment Schedule<\/strong><\/h1>\n<p>The table below lists each station shown in the reference boiler room layout, its function, and the key design parameter to confirm during equipment selection or vendor submittal review.<\/p>\n<table width=\"627\">\n<thead>\n<tr>\n<td width=\"33\"><strong>#<\/strong><\/td>\n<td width=\"173\"><strong>Equipment \/ Station<\/strong><\/td>\n<td width=\"240\"><strong>Function<\/strong><\/td>\n<td width=\"180\"><strong>Key Parameter \/ Spec<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td width=\"33\">1<\/td>\n<td width=\"173\">Electric Control Panel<\/td>\n<td width=\"240\">Central control &amp; safety interlocks for burner, feed pump, flame failure, low-water and high-pressure trips<\/td>\n<td width=\"180\">As per burner\/boiler OEM control schematic<\/td>\n<\/tr>\n<tr>\n<td width=\"33\">2<\/td>\n<td width=\"173\">Fuel Supply System<\/td>\n<td width=\"240\">Delivers fuel (gas \/ diesel \/ HFO) to burner via filter, pressure regulator &amp; shut-off solenoid<\/td>\n<td width=\"180\">Per burner capacity &amp; fuel type<\/td>\n<\/tr>\n<tr>\n<td width=\"33\">3<\/td>\n<td width=\"173\">Burner<\/td>\n<td width=\"240\">Ignites fuel-air mixture to fire the furnace tube<\/td>\n<td width=\"180\">Sized to boiler rated capacity (kg\/hr steam)<\/td>\n<\/tr>\n<tr>\n<td width=\"33\">4<\/td>\n<td width=\"173\">Boiler (Fire-tube, horizontal)<\/td>\n<td width=\"240\">Generates steam via flue-gas heat transfer through fire tubes<\/td>\n<td width=\"180\">Rated pressure, capacity (TPH), fitted with safety valve, pressure gauge, water level gauge<\/td>\n<\/tr>\n<tr>\n<td width=\"33\">5<\/td>\n<td width=\"173\">Economizer<\/td>\n<td width=\"240\">Recovers flue-gas waste heat to preheat feed water<\/td>\n<td width=\"180\">Typically improves efficiency 5\u201310%<\/td>\n<\/tr>\n<tr>\n<td width=\"33\">6<\/td>\n<td width=\"173\">Steam Header<\/td>\n<td width=\"240\">Collects &amp; distributes steam to plant steam supply lines<\/td>\n<td width=\"180\">Design pressure \u2265 boiler MAWP<\/td>\n<\/tr>\n<tr>\n<td width=\"33\">7<\/td>\n<td width=\"173\">Water Softener<\/td>\n<td width=\"240\">Removes hardness (Ca\/Mg) via ion-exchange resin<\/td>\n<td width=\"180\">Output hardness &lt; 1 ppm as CaCO3 (typical)<\/td>\n<\/tr>\n<tr>\n<td width=\"33\">8<\/td>\n<td width=\"173\">Water Tank<\/td>\n<td width=\"240\">Storage \/ buffer for softened water<\/td>\n<td width=\"180\">Sized for min. 20\u201330 min. feed reserve<\/td>\n<\/tr>\n<tr>\n<td width=\"33\">9<\/td>\n<td width=\"173\">Deoxygenated Water Pump<\/td>\n<td width=\"240\">Transfers softened water to\/through deaerator<\/td>\n<td width=\"180\">Per feed water flow rate<\/td>\n<\/tr>\n<tr>\n<td width=\"33\">10<\/td>\n<td width=\"173\">Deaerator<\/td>\n<td width=\"240\">Removes dissolved O2 and CO2 (mechanical + thermal, flash steam)<\/td>\n<td width=\"180\">Target dissolved O2 &lt; 0.007 ppm (EN standard)<\/td>\n<\/tr>\n<tr>\n<td width=\"33\">11<\/td>\n<td width=\"173\">Chemical Dosing Barrel<\/td>\n<td width=\"240\">Injects oxygen scavenger, alkalinity builder &amp; sludge conditioner<\/td>\n<td width=\"180\">Dosing rate per water analysis \/ boiler TDS control<\/td>\n<\/tr>\n<tr>\n<td width=\"33\">12<\/td>\n<td width=\"173\">Feed Pump (Duty\/Standby)<\/td>\n<td width=\"240\">Delivers treated, deaerated water into boiler against boiler pressure<\/td>\n<td width=\"180\">Discharge head \u2265 1.25 \u00d7 boiler MAWP<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<h1><strong>3. Process Flow<\/strong><\/h1>\n<h2><strong>3.1 Feed Water &amp; Steam Side<\/strong><\/h2>\n<p><strong>Raw Water\u00a0 \u2192\u00a0 Water Softener\u00a0 \u2192\u00a0 Water Tank\u00a0 \u2192\u00a0 Deoxygenated Water Pump\u00a0 \u2192\u00a0 Deaerator (+ Chemical Dosing)\u00a0 \u2192\u00a0 Feed Pump\u00a0 \u2192\u00a0 Boiler\u00a0 \u2192\u00a0 Economizer (flue-gas heat recovery)\u00a0 \u2192\u00a0 Steam Header\u00a0 \u2192\u00a0 Steam Supply (plant)<\/strong><\/p>\n<h2><strong>3.2 Fuel &amp; Combustion Side<\/strong><\/h2>\n<p><strong>Fuel Supply System\u00a0 \u2192\u00a0 Burner\u00a0 \u2192\u00a0 Boiler Furnace\u00a0 \u2192\u00a0 Flue Gas\u00a0 \u2192\u00a0 Economizer\u00a0 \u2192\u00a0 Chimney \/ Stack<\/strong><\/p>\n<h2><strong>3.3 Control<\/strong><\/h2>\n<p>The Electric Control Panel supervises burner firing sequence, feed pump duty\/standby switching, and monitors safety interlocks (flame failure, low water level, high steam pressure) across both sides of the process.<\/p>\n<h1><strong>4. Feed Water Treatment Chain \u2014 Purpose of Each Stage<\/strong><\/h1>\n<ul>\n<li>Water Softener: removes hardness-forming ions to prevent scale build-up on fire-tube surfaces, which reduces heat transfer and risks tube overheating\/failure.<\/li>\n<li>Water Tank: provides buffer storage and residence time ahead of deaeration.<\/li>\n<li>Deaerator: removes dissolved oxygen and CO2 \u2014 the leading cause of pitting corrosion in boiler shells, tubes, and condensate\/feed piping.<\/li>\n<li>Chemical Dosing Barrel: maintains correct alkalinity, scavenges residual oxygen, and conditions sludge\/TDS for controlled blowdown.<\/li>\n<li>Feed Pump: delivers conditioned water into the pressurised boiler shell; run in duty\/standby configuration for continuity.<\/li>\n<\/ul>\n<h1><strong>5. Water Quality Parameters (EN Standard Reference)<\/strong><\/h1>\n<p>Indicative feed-water and boiler-water limits for a low\/medium-pressure fire-tube boiler (below 20 bar). Actual limits should be confirmed against the boiler OEM&#8217;s water quality specification and RSC\/CKDL 2020 framework requirements.<\/p>\n<table width=\"627\">\n<thead>\n<tr>\n<td width=\"213\"><strong>Parameter<\/strong><\/td>\n<td width=\"207\"><strong>Feed Water Limit<\/strong><\/td>\n<td width=\"207\"><strong>Boiler Water Limit (typical, &lt;20 bar)<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td width=\"213\">pH @ 25\u00b0C<\/td>\n<td width=\"207\">8.5 \u2013 9.5<\/td>\n<td width=\"207\">10.5 \u2013 11.8<\/td>\n<\/tr>\n<tr>\n<td width=\"213\">Total Hardness (as CaCO3)<\/td>\n<td width=\"207\">&lt; 1 ppm<\/td>\n<td width=\"207\">\u2014<\/td>\n<\/tr>\n<tr>\n<td width=\"213\">Dissolved Oxygen<\/td>\n<td width=\"207\">&lt; 0.007 ppm (7 ppb)<\/td>\n<td width=\"207\">\u2014<\/td>\n<\/tr>\n<tr>\n<td width=\"213\">TDS<\/td>\n<td width=\"207\">&lt; 5 ppm<\/td>\n<td width=\"207\">&lt; 3000 ppm (blowdown controlled)<\/td>\n<\/tr>\n<tr>\n<td width=\"213\">Silica (as SiO2)<\/td>\n<td width=\"207\">&lt; 0.02 ppm<\/td>\n<td width=\"207\">&lt; 150 ppm<\/td>\n<\/tr>\n<tr>\n<td width=\"213\">Iron (as Fe)<\/td>\n<td width=\"207\">&lt; 0.05 ppm<\/td>\n<td width=\"207\">\u2014<\/td>\n<\/tr>\n<tr>\n<td width=\"213\">Alkalinity (P-alkalinity)<\/td>\n<td width=\"207\">\u2014<\/td>\n<td width=\"207\">sufficient to buffer, per dosing program<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<h1><strong>6. Room Layout &amp; Safety Clearances (RSC \/ BNBC 2020 Aligned)<\/strong><\/h1>\n<table width=\"627\">\n<thead>\n<tr>\n<td width=\"240\"><strong>Item<\/strong><\/td>\n<td width=\"280\"><strong>Minimum Clearance \/ Requirement<\/strong><\/td>\n<td width=\"107\"><strong>Reference<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td width=\"240\">Boiler front (burner side) to wall<\/td>\n<td width=\"280\">Min. 2.0 m for burner removal &amp; maintenance access<\/td>\n<td width=\"107\">BNBC 2020 \/ RSC Guidance<\/td>\n<\/tr>\n<tr>\n<td width=\"240\">Boiler rear \/ sides to wall<\/td>\n<td width=\"280\">Min. 1.0 m all-round for inspection &amp; tube cleaning<\/td>\n<td width=\"107\">BNBC 2020<\/td>\n<\/tr>\n<tr>\n<td width=\"240\">Boiler top to ceiling\/roof<\/td>\n<td width=\"280\">Min. 1.5 m (or per chimney\/duct routing needs)<\/td>\n<td width=\"107\">RSC Guidance<\/td>\n<\/tr>\n<tr>\n<td width=\"240\">Room ventilation<\/td>\n<td width=\"280\">Continuous fresh-air supply + power ventilation for combustion air &amp; heat removal; min. 2 air changes\/hr<\/td>\n<td width=\"107\">BNBC 2020, Fire Safety<\/td>\n<\/tr>\n<tr>\n<td width=\"240\">Emergency exits<\/td>\n<td width=\"280\">Minimum 2 independent exits from boiler room, outward opening<\/td>\n<td width=\"107\">RSC \/ Fire Safety Rules<\/td>\n<\/tr>\n<tr>\n<td width=\"240\">Fire-fighting provision<\/td>\n<td width=\"280\">CO2\/DCP extinguishers + fire hydrant point at room entry; fire-rated door (min. 2 hr)<\/td>\n<td width=\"107\">BNBC 2020 Part 4<\/td>\n<\/tr>\n<tr>\n<td width=\"240\">Safety valve discharge<\/td>\n<td width=\"280\">Vented to safe location outside room \/ above roof, away from walkways<\/td>\n<td width=\"107\">IBR \/ RSC Guidance<\/td>\n<\/tr>\n<tr>\n<td width=\"240\">Electrical fittings<\/td>\n<td width=\"280\">Flame-proof \/ weatherproof fittings near fuel &amp; burner zone<\/td>\n<td width=\"107\">BNBC 2020 Electrical Code<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h1><strong>7. Commissioning &amp; Inspection Checklist<\/strong><\/h1>\n<ul>\n<li>Verify safety valve set pressure and test lift\/reseat before first firing.<\/li>\n<li>Confirm low-water cut-off and flame-failure interlocks trip correctly (simulated test).<\/li>\n<li>Check economizer and feed line for leak-tightness under hydro test pressure.<\/li>\n<li>Verify water softener regeneration cycle and confirm treated water hardness &lt; 1 ppm.<\/li>\n<li>Confirm deaerator vent steam flow and dissolved oxygen at outlet meets target.<\/li>\n<li>Log chemical dosing rates against first-week boiler water TDS\/alkalinity trend.<\/li>\n<li>Confirm fire-fighting equipment, room ventilation, and emergency exits are in place before occupancy\/use.<\/li>\n<li>Record burner combustion efficiency test (O2\/CO in flue gas) and file with commissioning report.<\/li>\n<\/ul>\n<h1><strong>8. References<\/strong><\/h1>\n<ul>\n<li>Bangladesh National Building Code (BNBC), 2020 \u2014 Fire Safety &amp; Mechanical Services provisions.<\/li>\n<li>RSC (Remediation Coordination Cell) Guidance \u2014 boiler installation &amp; water quality compliance framework.<\/li>\n<li>Bangladesh Labour Act \u2014 provisions relevant to pressure vessel\/boiler operation and worker safety.<\/li>\n<li>Boiler OEM technical manual and water treatment vendor specification sheets (project-specific).<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>BOILER ROOM SETUP Equipment Layout, Process Flow &amp; Safety Compliance Reference RSC \/ BNBC 2020 Aligned 1. Overview This document describes a standard steam-boiler room setup for a fire-tube, horizontal industrial boiler installation, covering the fuel\/combustion side, the steam generation and distribution side, and the feed-water treatment train. It is intended as a reference for [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-100","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/alphasonarbanglamep.com\/index.php\/wp-json\/wp\/v2\/pages\/100","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alphasonarbanglamep.com\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/alphasonarbanglamep.com\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/alphasonarbanglamep.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/alphasonarbanglamep.com\/index.php\/wp-json\/wp\/v2\/comments?post=100"}],"version-history":[{"count":3,"href":"https:\/\/alphasonarbanglamep.com\/index.php\/wp-json\/wp\/v2\/pages\/100\/revisions"}],"predecessor-version":[{"id":448,"href":"https:\/\/alphasonarbanglamep.com\/index.php\/wp-json\/wp\/v2\/pages\/100\/revisions\/448"}],"wp:attachment":[{"href":"https:\/\/alphasonarbanglamep.com\/index.php\/wp-json\/wp\/v2\/media?parent=100"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}